zoom
The ground floor
Two weeks later and the pre-cast concrete beams are being lifted into place for the beam and block ground floor. A beam and block floor spans poor ground conditions below and, as the name suggests, these are infilled with concrete blocks, before being insulated and screeded over to form the ground floor. You can see the site operative dropping these blocks into place. The bricks are now on site to construct the external leaf of the external walls.

gotolink
Back to blog summary