First floor and rising
Despite the very wet Christmas break, the first floor pre-cast concrete (PCC) floor planks are now installed and blockwork is progressing up to eaves level.

zoom


The external walls above first floor level will be rendered, so facing brickwork has stopped at first floor level. The pre-cast concrete stair is now in place and an insitu concrete landing has been formed that will form the first floor balcony in the entrance.



zoom
This is currently being propped until the concrete has cured.